Select Page

8.2 – Current (Assets)

This is the set of Assets that can be tracked on the Panel. Proposed items must be evaluated by the team, who can accept them, which are moved to the Accepted list, or reject them, which are moved to the Asset History.

In the Accepted list, items are selected for display on the Panel and then moved to the Scheduled list.

In the Scheduled list, items can be sorted and modified.

In the Accepted and Scheduled lists, items can also be sorted manually by drag-and-drop, by clicking on the left end of the row, or by using the context menu, which can be accessed by clicking the arrow icon to the left of the item name, or simply by right-clicking anywhere on the item row.